Outdoor CFE-L coagulation flocculation

Coagulation flocculation CFE-L for outdoor use

With built-in flow divider, all in one complete block ready for use.

  • Total volume: 12 m3
  • Flow divider outlet: 3 x d110
  • Coagulation vats stirrer: 200 rpm 0.37kW tri. Can be modified
  • Coagulation vats stirrer: 60 tr/min 0.37kW tri. Can be modified
  • Fluid level: +1987 mm
Clear
SKU: Coagulation-flocculation-CFE-L Category:

Equipped with a hood and a reinforced anti-UV structure, CFE-L flocculator coagulator is a standardized equipment with many options: position of the inlets and outlets, connections, type of stirrers… It is therefore necessary to fill in the design form opposite so that we can provide you with a detailed quotation and a 3D plan.
<< Click to view the flocculator coagulator design form.

Reduce the size of your facilities with the CFE-L physico-chemical treatment. This 12 m3 structure, intended for outdoor use, is composed of a coagulation tank and a flocculation tank. Thanks to the formation of flocs, this equipment allows, among others:

  • TSS and colloid removal
  • Silt and clay agglomeration
  • Heavy metals precipitation

You will find below some characteristics specific to flocculators coagulators and the advantages of the CFE-L:

The coagulation flocculation allows an agglomeration of the particles between them. Since they are larger and heavier, they settle much better. This has many benefits:

  • The sedimentation process is accelerated, as the Hazen speed increases
  • As the velocity increases, the settling area decreases, which results in significant savings on settling
  • The outlet water is of better quality because the smallest particles have also been trapped in the flocs
  • The sludge is of better quality because it is more compact and more concentrated. They are also easier to process by centrifugation for example

Whether for a new installation or to complete an existing treatment:

    • Treatment of waste sludge,
    • Industrial sewage
    • Water purification
    • Elimination of organic and inorganic pollutants (particulate and/or dissolved, colloids),
    • Suspended solids removal (SS),
    • Phosphorus precipitation,
    • Clay suspensions and mixes,
    • Cement milks,
    • Metal and anion removal,
    • Suppression of certain populations of microorganisms,
    • Removal of oil particles and grease
    • Rainwater and runoff
    • Metal processing
    • Mining
    • Paper and board

Stirrers:

    • All the parts in contact with the liquid: stainless steel 316L

Connections:

    • PVC/ PP

Structure:

    • Internal and sole: 20 mm polypropylene
    • External: polypropylene foam >50mm
    • Hood (for CFE): polypropylene foam. >50mm non-skid
    • Stainless steel cylinders (for CFE)

Stirrers:

    • 0,37kW, IP55, 3×400 V Motors
    • Rotation speed of the coagulation vat: 200 rpm in base.
    • Rotation speed of flocculation vat: 60 rpm in base

Flow divider:

    • 3 adjustable outlet in d110
    • each outlet is completely insulated.

Inlets and outlets

    • Water inlet d160: either on the left (as shown) or on the right
    • D110 outlet  in reverse of inlet: right (as shown) or left
    • Safety overflow d160: optionally front, left, right (as shown)

Supply of separate stirrers

    • If you have your favorite brand of stirrer that you want to install yourself, you will get a discount for the 2 mixers.
    • If you only want a large mixing vat, then you can order only one stirrer.

Strengthening the bottom of the clarifier

    • With even more resistant materials for very sandy waters

Inlets and outlets

    • All inlets and outlets can be equipped with :
      • union up to d63
      • of adhesive/flange: diameter at choice

Shipping

All over the world, 1h2o3 packages have dimensions compatible with transport in HC containers.

Delays

    • 10 to 14 weeks.

Once the order has been placed, the above-mentioned period runs (excluding weeks 31 to 34 and 51 to 52) from the date of receipt of payment and validation of the project plan (including all the options requested in the case of special requests). As soon as the equipment is ready, it will be shipped to you. A road transport requires approximately one week to set up, it can take up to 3 weeks for a container depending on the destination.

Available at any time:

    • Pictures of completed installations
    • 2D/3D Images
    • Technical data sheets

Given on delivery :

    • EC certificate or declaration of incorporation *
    • Leakage test report *
    • Assembly instructions
    • Manual Operating
    • Technical details *
    • List of spare parts and supplies *

* If applied

Coagulation Flocculation CF range for 1h2o3 building

Coagulation Flocculation CF range for 1h2o3 building

The reinforced construction allows to contain pressures, whether they come from the inside because of the water, or from the outside with the earth. Placed on a solid foundation, a package can be:

  • – completely buried
  • – partially buried (example: 1.10 m overhang)
  • – simply placed on the slabMBBR BOX enclosed or concealed installation options 1h2o3

Warranty:

    • 2 years, under normal conditions of use on parts and labor, as specified in the order.

Warranty extension:

    • This equipment can benefit from an extended warranty. The conditions of this extension will be discussed on a case-to-case basis.

You may also like…

Shopping Cart
preloader