The CFHE-M large flocculator coagulator is a standardised piece of equipment with a wide range of very important options: position of inlets and outlets, connections, type of agitators, etc.
To be able to draw up a precise estimate and a 3D plan, you need to fill in the dimensioning form opposite. << Click to display the flocculator coagulator sizing form
With its large volume of 11 m3 and its compact size, the CFHE-M flocculator coagulator is perfect for outdoor installation with its removable cover.
Composed of a tank with a coagulation chamber and a flocculation chamber in which the water is treated with a coagulant product that helps gather suspended particles into larger clumps, called flocs, it is used for:
remove impurities
heavy metal precipitation
the agglomeration of silts and clays
Suspended particles in water and colloids
The flocculation process then allows the flocs to group together into larger and heavier clusters that can be easily separated from the water. This process can thus improve water quality and make it safer to drink.
You will find below some of the characteristics of the flocculators and the advantages of the CFHE-M:
The coagulation flocculation allows an agglomeration of the particles between them and is adapted to your needs. Since they are larger and heavier, they settle much better. This has many benefits:
The sedimentation process is accelerated, as the Hazen speedincreases
As the velocity increases, the settling area decreases, which results in significant savings on settling
The output water is of better quality because the smallest particles have also been trapped in the flocs.
The sludge is of better quality because it is more compact and more concentrated. They are also easier to process by centrifugation for example
The manufacturing material of the polypropylene flocculation coagulation tanks are highly resistant to corrosion and environmentally friendly
The flows are allocated efficiently to separate the structures
Whether it is for a new installation or to complete an existing treatment:
Sewage sludge treatment,
Industrial wastewater
Drinking water treatment
Elimination of organic and inorganic pollutants (particulate and/or dissolved, colloids),
Removal of suspended solids (SS),
Phosphorus precipitation,
Clay suspensions and mixes,
Cement milks,
Metal and anion removal,
Suppression of certain populations of microorganisms,
Removal of oil particles and grease
Rainwater and runoff
Metal processing
Mining
Paper and board
Stirrers:
All the parts in contact with the liquid: stainless steel 316L
Speed of rotation of the coagulation vat: 200 rpm in base.
Rotation speed of flocculation vat: 60 rpm in base
Flow divider (except CFC):
3 adjustable outputs in d110
each output is completely insulated.
Inlets and outlets
Water inlet d160: either left (as shown) or right
Outputs d110 in reverse of input: right (as shown) or left
Safety overflow d160: optionally front, left, right (as shown)
Supply of separate stirrers
If you have your favorite brand of stirrer that you want to install yourself, you will get a discount for the 2 mixers.
If you only want a large mixing vat, then you can order only one stirrer.
Strengthening the bottom of the clarifier
With even more resistant materials for very sandy waters
Inlets and outlets
All entrances and exits can be equipped with :
connection up to d63
of adhesive/flange: diameter at choice
Shipping
All over the world, 1h2o3 packages have dimensions compatible with transport in HC containers.
Delays
10 to 14 weeks.
Once the order has been placed, the above-mentioned period runs (excluding weeks 31 to 34 and 51 to 52) from the date of receipt of payment and validation of the project plan (including all the options requested in the case of special needs). As soon as the equipment is ready, it will be shipped to you. A road transport requires approximately one week to set up, it can take up to 3 weeks for a container depending on the destination.
Available at any time:
Pictures of completed installations
2D/3D Images
Technical data sheets
Given on delivery :
EC certificate or declaration of incorporation *
Leakage test report *
Assembly instructions
Operating Manual
Technical details *
List of spare parts and supplies *
* If applied
The reinforced structure makes it possible to contain loads, whether they come from the inside through the water or from the outside through the soil. Placed on a concrete slab, a package can be :
Completely buried
Partially buried (example: 1.10 m overhang)
Simply laid on the slab
Warranty:
2 years, under normal conditions of use on parts, as defined at the time of the order.
Warranty extension:
This equipment can benefit from an extended warranty. The conditions of this extension will be discussed on a case-to-case basis.
Nous utilisons des cookies pour vous garantir la meilleure expérience sur notre site web. Si vous continuez à utiliser ce site, nous supposerons que vous en êtes satisfait.OK