Coagulation flocculation CF-S.

Coagulation flocculation CF-Savailable for rent with purchase option!

With built-in flow divider, all in one complete block ready for use.

  • Total volume: 4 m3
  • Flow divider outlet: 3 x d110
  • Coagulation vats stirrer: 200 rpm 0.37kW tri. Can be modified
  • Coagulation vats stirrer: 60 tr/min 0.37kW tri. Can be modified
  • Optional ACS drinking water version
SKU: Coagulation-flocculation-CF-S Category:

CF-S flocculator coagulator is a normalized equipment with a lot of options: position of inputs and outputs, connections, type of stirrers… Therefore, it is necessary to fill out the design form opposite so that we can provide you with a precise estimate and a 3D plan.
<< Click to view the flocculator coagulator design form

Reduce the size of your installations with theCF-S physico-chemical treatment. This 4 m3 building structure is made of a coagulation and a flocculation tank. With the formation of flocs, this equipment allows, among other things

  • The removal of suspended solids (MES) and colloids.
  • The agglomeration of silts and clays
  • heavy metal precipitation

You will find below some characteristics specific to flocculating coagulators and the advantages of the CF-S:

The coagulation flocculation allows an agglomeration of the particles between them and is adapted to your needs. Since they are larger and heavier, they settle much better. This has many benefits:

    • The sedimentation process is accelerated, as the Hazen speedincreases
    • As the velocity increases, the settling area decreases, which results in significant savings on settling
    • The output water is of better quality because the smallest particles have also been trapped in the flocs
    • The sludge is of better quality because it is more compact and more concentrated. They are also easier to process by centrifugation for example
    • The manufacturing material of the polypropylene flocculation coagulation tanks are highly resistant to corrosion and environmentally friendly
    • The flows are allocated efficiently to separate the structures

Whether it is for a new installation or to complete an existing treatment:

    • Treatment of sludge waste,
    • Industrial sewage
    • Water purification
    • Elimination of organic and inorganic pollutants (particulate and/or dissolved, colloids),
    • Suspended solids removal (SS),
    • Phosphorus precipitation,
    • Clay suspensions and mixes,
    • Cement milks,
    • Metal and anion removal,
    • Suppression of certain populations of microorganisms,
    • Removal of oil particles and grease
    • Rainwater and runoff
    • Metal processing
    • Mining
    • Paper and board

Stirrers:

    • All the parts in contact with the liquid: stainless steel 316L

Connections:

    • PVC/ PP

Structure:

    • Internal and sole: 20 mm polypropylene
    • External: polypropylene foam >50mm
    • Hood (for CFE): polypropylene foam. >50mm non-skid
    • Stainless steel cylinders (for CFE)

Stirrers:

    • 0,37kW, IP55, 3×400 V Motors
    • Speed of rotation of the coagulation vat: 200 rpm in base.
    • Rotation speed of flocculation vat: 60 rpm in base

Flow divider (except CFC):

    • 3 adjustable outputs in d110
    • each output is completely insulated.

Inlets and outlets

    • Water input d160: either on the left (as shown) or on the right
    • Outputs d110 in reverse of input: right (as shown) or left
    • Safety overflow d160: optionally front, left, right (as shown)

Supply of separate stirrers

    • If you have your favorite brand of stirrer that you want to install yourself, you will get a discount for the 2 mixers.
    • If you only want a large mixing vat, then you can order only one stirrer.

Strengthening the bottom of the clarifier

    • With even more resistant materials for very sandy waters

Inlets and outlets

    • All entrances and exits can be equipped with :
      • connection up to d63
      • of adhesive/flange: diameter at choice

Shipping

All over the world, 1h2o3 packages have dimensions compatible with transport in HC containers.

Delays

    • 10 to 14 weeks.

Once the order has been placed, the above-mentioned period runs (excluding weeks 31 to 34 and 51 to 52) from the date of receipt of payment and validation of the project plan (including all the options requested in the case of special requests). As soon as the equipment is ready, it will be shipped to you. A road transport requires approximately one week to set up, it can take up to 3 weeks for a container depending on the destination.

Available at any time:

    • Pictures of completed installations
    • 2D/3D Images
    • Technical data sheets

Given on delivery :

    • EC certificate or declaration of incorporation *
    • Leakage test report *
    • Assembly instructions
    • Operating Manual
    • Technical details *
    • List of spare parts and supplies *

* If applied

Coagulation Flocculation CF range for 1h2o3 building

Coagulation Flocculation CFE range for outdoor use 1h2o3

The reinforced construction allows to contain pressures, whether they come from the inside because of the water, or from the outside with the earth. Placed on a solid foundation, a package can be:

  • – completely buried
  • – partially buried (example: 1.10 m overhang)
  • – simply placed on the slabMBBR BOX enclosed or concealed installation options 1h2o3

Warranty:

    • 2 years, under normal conditions of use on parts, as defined at the time of the order.

Warranty extension:

    • This equipment can benefit from an extended warranty. The conditions of this extension will be discussed on a case-to-case basis.

You may also like…

Shopping Cart
preloader