Pufferbecken BT66-M – geeignet für Miete mit Kaufoption!!!
Industrial buffer tank for storage of all types of effluent. Thick-walled, rigid polypropylene honeycomb allows full or partial underground installation. The lift pumps can be positioned at different heights, to smooth out hydraulic load peaks.
Total volume : 2,64 m³
Variable number of 316 L stainless steel lift pumps installed
Includes safety overflow valve
Protection: without cover, for use in buildings
Thick, rigid polypropylene walls: can be completely or partially buried
Flüssigkeitsstand: +2020 mm
Draining
Can be combined with any equipment in the M range
Ein Pufferbecken ist in der Wasseraufbereitung wichtig. It smoothes the stream, reducing the size and energy consumption of downstream equipment.
Buffer tankare frequently used in water treatment. It smoothes out hydraulic (and therefore organic) loads, which facilitates treatment in the downstream treatment plant. To determine the buffer volume and the appropriate quantity of pumps, please fill in the design form on the right, so that we can provide you with a precise quotation and a 3D drawing. << Click here to access the buffer tank design form
There are many advantages in using a buffer to reduce flow and pollutant load:
Thanks to peak flow reduction, downstream equipment can be smaller
The plant’s overall performance is therefore lower
The energy consumed by the entire process is dispersed across a wider timescale, generating electricity savings, for example, as night-time kWh is generally cheaper than daytime kWh.
Benefits of using a buffer tank
The buffer tank smoothes effluent flows and loads on the downstream water treatment process. Each tank is individually adapted to your needs with the following advantages:
CAPEX savings: Allows downstream processes to be designed based on a smoothed flow rather than on the peak.
OPEX savings: with a smoothed flow rate, peak power consumption is lower and biological treatments are more efficient.
Benefits specific to 1h2o3 buffer tanks
Custom-built: All our buffer tanks are made to order so that you can adapt them to your specific needs.
2 mounting methods: the thickness of the walls means that the tanks can be installed completely/partially underground or simply on a slab.
Strong structure: with its high-quality, hard-wearing materials, the buffer tank is built to last.
Wide capability choice: depending on the buffer volume required, there’s always a piece of equipment to meet your needs.
Easy to combine with other equipment: that’s the advantage of 1h2o3 products.
Corrosion-resistant: The materials used in each buffer tank are corrosion-resistant, which significantly improves equipment life expectancy.
Safety overflow: to prevent overflow
Environmental solution:The materials selected for manufacturing are 100% recyclable.
Outdoor use: for outdoor installations (E), the tanks are fitted with a non-slip cover and stainless steel jacks.
Easy to maintain: easy to access and use, with drain and lift pumps.
Whether it is for a new installation or to complete an existing treatment:
Sewage sludge treatment,
Industrial wastewater
Drinking water treatment
Elimination of organic and inorganic pollutants (particulate and/or dissolved, colloids),
Removal of suspended solids (SS),
Phosphorus precipitation,
Clay suspensions and mixes,
Cement milks,
Metal and anion removal,
Suppression of certain populations of microorganisms,
Removal of oil particles and grease
Rainwater and runoff
Metal processing
Mining
Paper and board
Shipping
All over the world, 1h2o3 packages have dimensions compatible with transport in HC containers.
Delays
10 to 14 weeks.
Once the order has been placed, the above-mentioned period runs (excluding weeks 31 to 34 and 51 to 52) from the date of receipt of payment and validation of the project plan (including all the options requested in the case of special needs). As soon as the equipment is ready, it will be shipped to you. A road transport requires approximately one week to set up, it can take up to 3 weeks for a container depending on the destination.
Available at any time:
Pictures of completed installations
2D/3D Images
Technical data sheets
Given on delivery :
EC certificate or declaration of incorporation *
Leakage test report *
Assembly instructions
Operating Manual
Technical details *
List of spare parts and supplies *
* If applied
The reinforced structure makes it possible to contain loads, whether they come from the inside through the water or from the outside through the soil. Placed on a concrete slab, a package can be :
Completely buried
Partially buried (example: 1.10 m overhang)
Simply laid on the slab
Warranty:
2 years, under normal conditions of use on parts, as defined at the time of the order.
Warranty extension:
This equipment can benefit from an extended warranty. The conditions of this extension will be discussed on a case-to-case basis.
Nous utilisons des cookies pour vous garantir la meilleure expérience sur notre site web. Si vous continuez à utiliser ce site, nous supposerons que vous en êtes satisfait.OK