BBM-S sludge tank

BBM-S sludge blanketeligible for rental with purchase option!

With optional drain pump, our BBM-S sludge tank stores sludge from municipal or industrial wastewater treatment plants in a complete, ready-to-use unit.

  • Total volume: 4 m3
  • Optional drain pump
  • Safety overflow
  • Fine-mesh screen to separate sludge and water
  • Flow divider outlet: 3 x d110
SKU: BBM-S Categories: ,

The sludge tank is a piece of equipment used to store sludge from municipal or industrial wastewater treatment plants (WWTPs), with several options and the possibility of being combined with one of our water treatment packages.

To do so, please fill in the design form opposite, so that we can provide you with a precise quotation and a 3D plan.
<< Click to display the sludge tank sizing form

Depending on the wastewater treatment process used, this can be between 40% and 80%, depending on the type of sludge and operating conditions.

The purpose of a sludge tank is to store the sludge so that it can be used for other purposes, or treated at a later date. It consists of :

  • a tank
  • optional drain pump
  • an overflow
  • a drain

Whether it is for a new installation or to complete an existing treatment:

    • Treatment of sludge waste,
    • Industrial sewage
    • Water purification
    • Elimination of organic and inorganic pollutants (particulate and/or dissolved, colloids),
    • Suspended solids removal (SS),
    • Phosphorus precipitation,
    • Clay suspensions and mixes,
    • Cement milks,
    • Metal and anion removal,
    • Suppression of certain populations of microorganisms,
    • Removal of oil particles and grease
    • Rainwater and runoff
    • Metal processing
    • Mining
    • Paper and board

Building sludge tank range 1h2o3

Stirrers:

    • All the parts in contact with the liquid: stainless steel 316L

Connections:

    • PVC/ PP

Structure:

    • Internal and sole: 20 mm polypropylene
    • External: polypropylene foam >50mm
    • Hood (for CFE): polypropylene foam. >50mm non-skid
    • Stainless steel cylinders (for CFE)

Shipping

All over the world, 1h2o3 packages have dimensions compatible with transport in HC containers.

Delays

    • 10 to 14 weeks.

Once the order has been placed, the above-mentioned period runs (excluding weeks 31 to 34 and 51 to 52) from the date of receipt of payment and validation of the project plan (including all the options requested in the case of special requests). As soon as the equipment is ready, it will be shipped to you. A road transport requires approximately one week to set up, it can take up to 3 weeks for a container depending on the destination.

Available at any time:

    • Pictures of completed installations
    • 2D/3D Images
    • Technical data sheets

Given on delivery :

    • EC certificate or declaration of incorporation *
    • Leakage test report *
    • Assembly instructions
    • Operating Manual
    • Technical details *
    • List of spare parts and supplies *

* If applied

The reinforced construction allows to contain pressures, whether they come from the inside because of the water, or from the outside with the earth. Placed on a concrete slab, a package can be :

  • Completely buried
  • Partially buried (example: 1.10 m overhang)
  • Simply laid on the slabMBBR BOX enclosed or concealed installation options 1h2o3

Warranty:

    • 2 years, under normal conditions of use on parts, as defined at the time of the order.

Warranty extension:

    • This equipment can benefit from an extended warranty. The conditions of this extension will be discussed on a case-to-case basis.

You may also like…

Shopping Cart
preloader